- Advice for Consumers
- How to complain
- Ofcom licensing
- Find a document
- Research and Market Data
- Consultations
- Competition and Consumer Bulletin
- Media and Analysts
- Contacting Ofcom
- About Ofcom
Home > Spectrum > Information for Radiocomms Licences > Radiocommunications Licence Information > Types of Radio Use > Fixed Terrestrial Links > Windfarms >
Wind Farm Coordination Policy
When we are notified of a proposed windfarm, we will check to determine whether any part of that windfarm falls within 500 metres of the path between the terminals, or the terminals themselves, of any fixed link system operating above 1 GHz.
For scanning telemetry links, notifications will be forwarded on to CSS and JRC who will check whether any part of the windfarm falls within 1 kilometre of the path between the terminals, or the terminals themselves, of a fixed link system operating between 450 to 470 MHz.
If either check is positive, then we will inform the notifier that the windfarm proposer must liaise with the appropriate fixed link system operator(s).
Back to top