RA Logo

UK ITU-R Committee

*

The committee documents are listed below:

These are available to download in Word Logo Word

* Documents
* Study Group 1
 

- Task Group 1/8

* Study Group 3
* Study Group 4
* Study Group 6
* Study Group 7
* Study Group 8
  - Working Party 8F
* Study Group 9
* Working Party 4

 

Documents

*


Report of Commonwealth ITU Group Meeting

UK ITU-R(03)046
* Draft Agenda for UK ITU-R Meeting - Thursday 8 January UK ITU-R(03)045
* UK report on the meeting of ITU-R WP 3K, 19 - 28 November 2003, concerning information relevant to the RRC UK ITU-R(03)044
* Third Preparatory Conference (PrepCom-3) for The World summit on the Information Society (WSIS) UK ITU-R(03)043
* UK ITU-R Draft Minutes UK ITU-R(03)042
* ETSI Activities Update for UK ITU-R meeting UK ITU-R(03)041
* Guide to how ITU-R study groups work UK ITU-R(03)040
* Organisation of WRC-07 Preparations in CEPT UK ITU-R(03)039
* Leading groups and co-ordinators for WRC-07 Agenda Items UK ITU-R(03)038
* United Kingdom report on the world radiocommunication conference 2003 (WRC-03) UK ITU-R(03)037
* UK Delegation Report on the ITU Radiocommunication Assembly 2003 UK ITU-R(03)036
* Draft Agenda UK ITU-R(03)035
* Draft UK CPG Brief UK ITU-R(03)033
* Resolution 801 (WRC-2000) UK ITU-R(03)032
* Proposals for the work of the conference UK ITU-R(03)031
* Summary Report of ITU-R Study Group 7 Meeting, Geneva ( 6/7 Feb 2003) UK ITU-R(03)030
* UK candidature for Chairmanship of ITU-R Study Group 1 UK ITU-R(03)029
* Delegates Report of the CPG PT2 and PT3 meetings held 31/3 - 4/4 2003 (Edinburgh) UK ITU-R(03)028
* UK Status on Agenda Item 1.8.2 UK ITU-R(03)027
* Summary Report of the ITU-R Study Group 4 (Fixed-Satellite Service) Meeting, Geneva, 20 March 2003 UK ITU-R(03)026
* Headline Report from UK Study Group 6, Spring 2003 UK ITU-R(03)025
* Draft proposed modification to resolution ITU-R 12-1 UK ITU-R(03)024
* ITU-R WP 6M report to UK ITU-R UK ITU-R(03)023
* Agenda Item 7.2 - AMS(R)S Spectrum Provision UK ITU-R(03)022
* Summary Report of the ITU-R Study Group 9 (Fixed Services) Meeting Geneva, 15 April 2003 UK ITU-R(03)021
* Command and Control of Unmanned Air Vehicles UK ITU-R(03)020
* Agenda Item 7.2; Future Confreence Agenda Items - Aeronautical Spectrum Rationalisation UK ITU-R(03)019
* ITU-R Study Group 8 Report UK ITU-R(03)018
* Proposed text for multi-country proposal to RA-03 (version 5) UK ITU-R(03)017
* Proposed text for multi-country proposal to RA-03 UK ITU-R(03)016
* Draft Agenda UK ITU-R(03)015
* Draft minutes of the 11th meeting, Friday 10 January 2003
UK ITU-R(03)014
* UK (draft) Linking the strategic, financial and operational plans.
UK ITU-R(03)012
* WRC-03 agenda item 1.7.1. UK ITU-R(03)011
* RAG (draft) Luxembourg
UK ITU-R(03)010
* UK - draft - Improving working methods.
UK ITU-R(03)009
* Summary of decisions made at the 13th meeting of Chairmen & Vice-Chairmen of Radiocommunication Study Groups (CVC-13), Geneva, 29 November 2002.
UK ITU-R(03)008
* Chairman WP6M - Improved electronic access to documents.
UK ITU-R(03)007
* WRC-03 Agenda item 4; Review of Resolutions –ECC PT1
UK ITU-R(03)006
* WRC-03 Agenda item 4; Review of Resolutions - draft
UK ITU-R(03)005
* WRC-03 agenda item 4; Review of Resolutions of previous Conferences.
UK ITU-R(03)004
* Agenda Item 4 - Review of Resolutions - UK Draft.
UK ITU-R(03)003
* WRC-03 Agenda item 4; Review of Resolutions
UK ITU-R(03)002
* The Need for a CEPT position for WRC-03 A/I 4
UK ITU-R(02)55
* CPG Meeting UK Delegation Report : Perugia 4-8 Nov.02
UK ITU-R(02)54
* Potential ITU-R Cost Savings UK ITU-R(02)52
* Minutes of meeting of UK ITU-R: 29.10.02 UK ITU-R(02)50
* Draft ETSI standards recieved for Circ on OPs - PEs UK ITU-R(02)49
* Draft proposed Rev to CPM Rep (section 4.4 A/l 1.26) UK ITU-R(02)48
* Draft CEPT brief on A/l 1.26 UK ITU-R(02)47
* Sector Advisory Groups UK ITU-R(02)46
* Agenda Items 1.23 & 1.36 UK ITU-R(02)45
* Regulatory & Technical considerations: A/l 1.23 & 1.36 UK ITU-R(02)44
* Report from UK SG6 for ITU-R meeting 29.10.02 UK ITU-R(02)43
* Report on activities of ETSI for ITU-R meeting 29.10.02 UK ITU-R(02)42
* Agenda Item 1.5 UK ITU-R(02)41
* Completion of section 1.4 of CPM report to WRC-03 UK ITU-R(02)40
* Procedural aspects of operational & aditional op epfd limits UK ITU-R(02)39
* Preliminary Views: WRC-03 Various A/l 1.13 - 1.39 UK ITU-R(02)38
* R Jones, ITU letter Re:9/LCCE/73 UK ITU-R(02)37
* UK Input to CPM02-2: Rev to CPM 2.8.2 - A/I 1.31 UK ITU-R(02)35
* WRC-03 Agenda Item 1.34 [R Cooper] UK ITU-R(02)34
* Draft UK Contribution CEPT to the CPM: A/11.5 UK ITU-R(02)33
* UK Input to CPM02-2: WRC-03 Agenda Item 1.22 UK ITU-R(02)32
* WP6M Report & TG6/9 Report to ITU-R 29.10.02 UK ITU-R(02)31
* Report from the Chairman ITU-R WP3M to UK ITU-R UK ITU-R(02)29
* Minutes Of The Ninth Meeting Held On Friday 7 June 2002 In Wyndham House UK ITU-R(02)25
* UK brief for CPG - WRC Agenda Item 1.21 UK ITU-R(02)24
* Headline report from UK Study Group 6 from 12 February to 7 June 2002 UK ITU-R(02)23
* Summary brief for CPG on WRC Agenda Items 1.11, 1.18, 1.27, 1.29, 1.32, 1.35, 1.39 (results of CPG/PT3 meeting May 02) UK ITU-R(02)22
* Informal report to UK ITU-R on SG3 block meeting: Geneva, 20 May-4 June '02 UK ITU-R(02)21
* Proposed UK CPG input relating to an amendment to the CEPT brief for Agenda Item 1.5 UK ITU-R(02)20
* Extending the limits of applicability of the Radio Regulations above 3 000 GHz UK ITU-R(02)19
* Revised guidelines for the working methods of the Radiocommunication Assembly, Study Groups & related groups UK ITU-R(02)18
* Radio Advisory Group, 25 February-1 March 2002, Delegation report UK ITU-R(02)16
* Satellite Backlog Action Group UK ITU-R(02)15
* Informal group on the draft ITU Strategic Plan 2003-2007
UK ITU-R(02)14
*

Draft Minutes - Eighth meeting UK ITU-R 12.2.

UK ITU-R(02)13
*

Proposals Relation to Resolution 80 (Rev.WRC-2000) (Shaw)

UK ITU-R(02)12
*

Contribution to the CPG03-3 meeting (Oslo) (Jaycock)

UK ITU-R(02)11
*

Timing of ITU-R Study Group Meetings (Shaw)

UK ITU-R(02)10
*

RAG - Draft Brief - The Radio Regulatory Board (Barrett)

UK ITU-R(02)09
*

RAG - Draft ITU-R Study Group Structure (Barrett)

UK ITU-R(02)08
*

Optimum Structure for WRC-2003 (Shaw)

UK ITU-R(02)07
*

Resolution 80 Briefing notes (Shaw)

UK ITU-R(02)06
*

Comments to the RRB and RAG on Columbian doc (Shaw)

UK ITU-R(02)05
*

UK Delegation Report - 4th CPG/PTI meeting. Paris 23-25.1.02

UK ITU-R(02)04
*

Agenda for Eighth meeting UK ITU-R 12.2.02 (Secretary)

UK ITU-R(02)03
*

Canada - Terrestrial Wireless Communications Structure(Barratt)

UK ITU-R(02)02
*

Final Report RAG WRC-CPM Process Review (Barratt)

UK ITU-R(02)01
* Draft UK Input to the WRC/CCPM Process Review UK ITU-R(01)62
* RAG WRC-CPM Process Review Spain UK ITU-R(01)61
* RAG WRC-CPM Process Review France UK ITU-R(01)60
* RAG WRC-CPM Process Review Canada UK ITU-R(01)59
Bullet Point SG8 Meeting Report UK ITU-R(01)58
Bullet Point Timing of ITU-R SG Meetings in Relation to Meetings of their WPS and TGS UK ITU-R(01)57
* Minutes of UK ITU-R Meeting 23 November 2001 UK ITU-R(01)56
Bullet Point Headline Report for SG6 UK ITU-R(01)55
Bullet Point Headline Report for SG4 UK ITU-R(01)54
Bullet Point CPG/PT1-0S Delegate's Report UK ITU-R(01)53
Bullet Point 3rd CPG PT1 Meeting, 24-26 Oct 2001, Luxemborg - Possible Structure for WRC-03 UK ITU-R(01)52
Bullet Point Establishment of the Global Radiocomms Standardisation Collaboration UK ITU-R(01)51
Bullet Point Letters sent to various ITU entities concerning SAT_BAG UK ITU-R(01)50
Bullet Point Agenda for UK ITU-R Briefing Group Meeting 22 November 2001 UK ITU-R(01)49
Bullet Point Summary Report of the ITU-R SG4-9 (Fixed/Fixed Sat Service Sharing) Meeting, 24 Oct 2001, Geneva UK ITU-R(01)48
Bullet Point Summary Report of the ITU-R SG9 (Fixed Services) Meeting 11-12 Oct 2001, Geneva UK ITU-R(01)47
Bullet Point Resolution 80 WRC 2000 - RAG Correspondence Group UK ITU-R(01)46
Bullet Point Satellite Backlog Action Group, Geneva 1-2 October 2001. Delegation Report. UK ITU-R(01)45
Bullet Point CPG, Paris, 4-6 September 2001 - Delegation Report UK ITU-R(01)44
Bullet Point Minutes of meeting of ITU_R held on 30 August 2001 UK ITU-R(01)43
Bullet Point Draft Guidelines for the Working Methods of the Radiocomm Assembly, the Radiocomm SG's and Related Groups UK ITU-R(01)42
Bullet Point Draft Decision of SG6 UK ITU-R(01)41
* Draft UK Input to SAT-BAG. An update on the factors associated with the satellite filing backlog UK ITU-R(01)40
Bullet Point UK Preparation for CPG03-2: Checklist of CEPT Briefs for WRC03 (prepared 29 August 2001) UK ITU-R(01)37
Bullet Point UK Proposals for changes to the draft CEPT for Agenda Item 1.21 UK ITU-R(01)36
Bullet Point Comments on CEPT brief UK ITU-R(01)35
Bullet Point Headline Report for UK Study Group 6 UK ITU-R(01)33
* This document shows ETSI Ops (One-Step-Approval) Pes (Public Enquiry) and Votes received from ETSI since March 2001 UK ITU-R(01)32
Bullet Point Calling Notice - 3 August 2001 Notice
Bullet Point Agenda for Meeting UK ITU-R on 30 August 2001 UK ITU-R(01)31
Bullet Point Comments on the Strategic Plan Structure and Proposals for new ITU-R Goals UK ITU-R(01)30
Bullet Point Delegation Report RAG 12-16 March 2001 UK ITU-R (01)28
Bullet Point ITU Reform Group Final Meeting, Salvador, Brazil 2-6 April 2001 - Delegation Report UK ITU-R (01)27
Bullet Point Delegate's Report ITU Reform, Paris 1-2 March 2001 UK ITU-T (01)30
Bullet Point Radio Advisory Group, 12-16 March 2001 Delegation Report UK ITU-R (01)27
Bullet Point Minutes of Meeting 6 February 2001 UK ITU-R (01)22
Bullet Point UK Delegation report on the first meeting of ITU-R JTG 4-7-8-9 UK ITU-R (01)16
Bullet Point Convener, Correspondence Group on ITU-R Study Group Structure 1 UK ITU-R (01)15
Bullet Point Organisation of work in the CPG UK ITU-R (01)11
Bullet Point Convener, Correspondence Group on ITU-R Study Group Structure 1 UK ITU-R (01)10
Bullet Point Radiocommunication Advisory Group - Linking Operational & Financial Planning UK ITU-R (01)09
Bullet Point Headline Report from UK Study Group 6 UK ITU-R (01)08
Bullet Point Headline Reports from UK SG4 and UK JTG4-7-8 UK ITU-R (01)07
Bullet Point ITU-R Study Group 9 (Fixed Services) Headline Report to February 2001 UK ITU-R (01)06
Bullet Point ETSI Ops (One-Step-Approval) Pes (Public Enquiry) and Votes received from ETSI since October 2000 UK ITU-R (01)04
Bullet Point Draft 2001 Operational Plan for ITU-R Sector

UK ITU-R (01)03

Bullet Point Ninth meeting of the Radiocommunication Advisory Group UK ITU-R (01)02
Bullet Point Study Group 8 Meeting Report UK ITU-R (00)40

Top button

*

Study Group 1 - ITU Documents

Bullet Point CP(01)29 Draft Minutes Of Meeting Of UK Study Group 1 Held On Friday 28 September 2001, Wyndham House At 13.30 PM.
Bullet Point CP(01)28 CEPT Views and Identified Regulatory Issues on the Impact of UWB Systems on Other Radio Services, in Particular the Passive Services
Bullet Point CP(01)27 CEPT Views & Identified Regulatory Issues on the Impact of UWB Systems etc.
Bullet Point CP(01)26 Agenda for UK SG1 Meeting on 28/09/01
Bullet Point CP(01)05 Delegates Report ITU-R Study Group 1

Task Group 1/8 - ITU Documents

Bullet Point CP(03)11 Propagation Model for UWB on Fixed Service
Bullet Point CP(03)10 GSME position UWB final 14 February 2003
Bullet Point CP(03)09 UWB Compatibility Study (LS to WGSE PT24)
Bullet Point CP(03)08 UWB Protection for Aviation Systems
Bullet Point CP(03)07 Potential of UWB rev1
Bullet Point CP(03)06 Definition of UWB Systems
Bullet Point CP(03)05 Airborne interface estimates
Bullet Point CP(03)04 TG 1/8 Temps set 1
Bullet Point CP(03)03 UK Delegation Report ITU-R TG1/8 21-24 Jan 2003
Bullet Point CP(03)02 Draft agenda

Top button

Study Group 3 - ITU Documents

Bullet Point CP96 Comments on Observations to 1546
Bullet Point CP94 Informal report to UK ITU-R on SG3 block meeting: Geneva 20 May - 4 June '02
Bullet Point CP93 Report from Chairman ITU-R WP 3M to UK ITU-R
Bullet Point CP92 Proposed revision to Recommendation ITU-R P. 531-6. Improved procedure for evaluating TEC. (Please note this document was submitted to Geneva by the French Administration).
Bullet Point CP91 Minutes of the 9th meeting of UK Study Group 3 held on 7 May 2002
Bullet Point CP89/90 Proposed revision to the method for predicting vegetation attenuation above 1 GHz in Recommendation ITU-R P.833.2
Bullet Point CP88 Proposed Revision To The Mode (2) Rain Scatter Interference Prediction Methodology In Recommendation ITU-R P.452-10
Bullet Point CP87 A New Model For Mode (2) Rain Scatter Interference Calculations For Recommendation ITU-R P.452 (Revision 1) Zip logo (2.7 MB)
Bullet Point CP86

Proposed Revision To Recommendation ITU-R P. 1411-1: Frequency Difference Functions (Revision 1)

Bullet Point CP85 Proposed Revision To Recommendation ITU-R P. 1411-1: Dependence Of RMS Delay Spread On Shadowing (Revision 1)
Bullet Point CP82 Comments On 3M/50: Model Combination for Transhorizon paths in P.452.
Bullet Point CP81 Proposed Revision Of Recommendation ITU-R P.452 - Removal Of Discontinuities - Further Proposed Changes (Revision 1) Zip logo (776 KB)
Bullet Point CP74 Recommendation ITU-R P.533 - HF propagation prediction method. Recommendation ITU-R P.842 -Computation of reliability & compatability of HF radio systems.
Bullet Point CP73 Proposed revisions to Recommendation ITU-R P 620-4
Bullet Point CP72 Element for inclusion in Handbook on interference
Bullet Point CP71 A new model for Mode (2) rain scatter interference calculations for Recommendation ITU-R P 620-4
Bullet Point CP70 Route dependence of wideband channel characteristics (Revision 1)
Bullet Point CP69 Proposed Revision to Recommendation ITU-R P. 1407 - Multipath Propagation and Parameterisation of its Characteristics (Revision 1)
Bullet Point CP65 Multipath Propagation & Parameterisation of its Characteristics.
Bullet Point CP64 Minutes of the 7th meeting of UK Study Group 3 held on 1 November 2001
Bullet Point CP61 Minutes of the 6th meeting of UK Study Group 3 held on 26 September 2001
Bullet Point CP67 Information Paper: Development towards a model for combined rain and sleet attenuation (Revision 3)
Bullet Point CP66 Proposed revision of P.1546
Bullet Point CP65 Information document, Comments in response to document 3K/19 - Dr Bacon
Bullet Point CP62 A generic model for the determination of 1-60 GHz radio propagation loss through vegetation - Dr Rogers
Bullet Point CP60 Minutes if the 4th meeting of UK Study Group 3 held on 4 April 2002
Bullet Point CP55 UK input - Proposed deletion of Recommendations
Bullet Point CP54 UK input - Further developments on mode (2) rain scatter interference calculations for Recommendation ITU-R P.620-4, and comparisons with Recommendation ITU-R P.452-9 and experimental measurements
Bullet Point CP53 UK input - Indoor reception measurements of UHF television signals
Bullet Point CP52 UK input - Proposed revision to Recommendation ITU-R P.837-2
Bullet Point CP51 UK input - Draft update for Chapter 6 on Gaseous Attenuation, for the WP3J Handbook on Radiometeorology
Bullet Point CP49 Sample test results using [DNR] with profile interpretation
Bullet Point CP48 Proposed revision to Recommendation ITU-R P.838
Bullet Point CP46 Proposed revisions of [DNR]
Bullet Point CP45 Comparision of models for rain attenuation
Bullet Point CP44 Modelling rain scatter interference: A fresh analysis
Bullet Point CP43 Recommendation P.452. An aide memoire
Bullet Point CP42 Future working practices
Bullet Point CP38 Question ITU-R 265/4
Bullet Point CP1 rev4 List of UK SG3 committee papers - 5 april 2001

Top button

Study Group 4 - ITU Documents

Bullet Point CP(03)13 ITU-R WP4B issues for UK SG4 consideration
Bullet Point CP(03)12 Minutes 27 February 2003
Bullet Point CP(03)11 Executive summary report of ITU-R WP4B meeting, Geneva, 21-28 March 2003
Bullet Point CP(03)10 Chairmans report from the meeting of working party 4A, Geneva, 10 - 19 March 2003
Bullet Point CP(03)09 Peak to Mean Ratios of PSK Spectra
Bullet Point CP(03)08 WP4A France Contributions Zip logo
Bullet Point CP(03)07 Canadian contributions to WP4A and WP4B meetings Zip logo
Bullet Point CP(03)06 Report to WP4A Automation of article S5
Bullet Point CP(03)05 Proposed modification to Recommendation S.524-7
Bullet Point CP(03)04 off-axis EIRP spectral density limits for the band 27.5-29.5 Ghz FSS band to Recommendation S.524-7
Bullet Point CP(03)03 epfd statistics for various types of HEO system in the 4 GHz FSS band
Bullet Point CP(03)02 Draft agenda 27 February 2003
Bullet Point CP(03)01 Guidelines for removal of non-compliance with operational and additional operational epfd limits
Bullet Point CP(02)43 Minutes 18 December 2002
Bullet Point CP(02)36 Minutes of meeting: UK SG4, 9 September 2002
Bullet Point CP(02)34 Framework for further ITU-R studies concerning HEOs
Bullet Point CP(02)33 Procedural aspects of Operational and Add op. epfd limits
Bullet Point CP(02)32 Note from UK Chairman to Taylor & VonDeak Re: Correspond. group
Bullet Point CP(02)31 Agenda for meeting of UK SG4: 9.9.02
Bullet Point CP(02)30 Explanation of Changes: Two tables of parameter values for ESVs
Bullet Point CP(02)27 (Ad. 1) Response to Mr Rossi Re: Review of WRC Res's & Rec's
Bullet Point CP(02)27 General view of Resolutions & Recommendations of WARC/WRC
Bullet Point CP(02)24 (final) Minutes of UK SG4 meeting: 30.5.02
Bullet Point CP(02)23 (Rev 1) Update: Environmental protection GSO
Bullet Point CP(02)21 Report of meeting of WP4B: April 2002
Bullet Point CP(02)20 Summaries of recently adopted SG4 RECS/REVS
Bullet Point CP(02)19 Chairman's report from WP4A:April 2002
Bullet Point CP(02)18 (modified) Ito letter from Chairman UK SG4
Bullet Point CP(02)17 Minutes of tenth meeting UK SG4: 22 March 2002
Bullet Point CP(02)15 Sharing of the FSS allocation at 40/50 GHz
Bullet Point CP(02)14 WRC Agenda item 1.37
Bullet Point CP(02)13 Draft conference preparatory meeting report, section 3.4