RA Logo

UK ITU-R Committee

*

The committee documents are listed below:

These are available to download in Word Logo Word

* Documents
* Study Group 1
 

- Task Group 1/8

* Study Group 3
* Study Group 4
* Study Group 6
* Study Group 7
* Study Group 8
  - Working Party 8F
* Study Group 9
* Working Party 4

 

Documents

*


Report of Commonwealth ITU Group Meeting

UK ITU-R(03)046
* Draft Agenda for UK ITU-R Meeting - Thursday 8 January UK ITU-R(03)045
* UK report on the meeting of ITU-R WP 3K, 19 - 28 November 2003, concerning information relevant to the RRC UK ITU-R(03)044
* Third Preparatory Conference (PrepCom-3) for The World summit on the Information Society (WSIS) UK ITU-R(03)043
* UK ITU-R Draft Minutes UK ITU-R(03)042
* ETSI Activities Update for UK ITU-R meeting UK ITU-R(03)041
* Guide to how ITU-R study groups work UK ITU-R(03)040
* Organisation of WRC-07 Preparations in CEPT UK ITU-R(03)039
* Leading groups and co-ordinators for WRC-07 Agenda Items UK ITU-R(03)038
* United Kingdom report on the world radiocommunication conference 2003 (WRC-03) UK ITU-R(03)037
* UK Delegation Report on the ITU Radiocommunication Assembly 2003 UK ITU-R(03)036
* Draft Agenda UK ITU-R(03)035
* Draft UK CPG Brief UK ITU-R(03)033
* Resolution 801 (WRC-2000) UK ITU-R(03)032
* Proposals for the work of the conference UK ITU-R(03)031
* Summary Report of ITU-R Study Group 7 Meeting, Geneva ( 6/7 Feb 2003) UK ITU-R(03)030
* UK candidature for Chairmanship of ITU-R Study Group 1 UK ITU-R(03)029
* Delegates Report of the CPG PT2 and PT3 meetings held 31/3 - 4/4 2003 (Edinburgh) UK ITU-R(03)028
* UK Status on Agenda Item 1.8.2 UK ITU-R(03)027
* Summary Report of the ITU-R Study Group 4 (Fixed-Satellite Service) Meeting, Geneva, 20 March 2003 UK ITU-R(03)026
* Headline Report from UK Study Group 6, Spring 2003 UK ITU-R(03)025
* Draft proposed modification to resolution ITU-R 12-1 UK ITU-R(03)024
* ITU-R WP 6M report to UK ITU-R UK ITU-R(03)023
* Agenda Item 7.2 - AMS(R)S Spectrum Provision UK ITU-R(03)022
* Summary Report of the ITU-R Study Group 9 (Fixed Services) Meeting Geneva, 15 April 2003 UK ITU-R(03)021
* Command and Control of Unmanned Air Vehicles UK ITU-R(03)020
* Agenda Item 7.2; Future Confreence Agenda Items - Aeronautical Spectrum Rationalisation UK ITU-R(03)019
* ITU-R Study Group 8 Report UK ITU-R(03)018
* Proposed text for multi-country proposal to RA-03 (version 5) UK ITU-R(03)017
* Proposed text for multi-country proposal to RA-03 UK ITU-R(03)016
* Draft Agenda UK ITU-R(03)015
* Draft minutes of the 11th meeting, Friday 10 January 2003
UK ITU-R(03)014
* UK (draft) Linking the strategic, financial and operational plans.
UK ITU-R(03)012
* WRC-03 agenda item 1.7.1. UK ITU-R(03)011
* RAG (draft) Luxembourg
UK ITU-R(03)010
* UK - draft - Improving working methods.
UK ITU-R(03)009
* Summary of decisions made at the 13th meeting of Chairmen & Vice-Chairmen of Radiocommunication Study Groups (CVC-13), Geneva, 29 November 2002.
UK ITU-R(03)008
* Chairman WP6M - Improved electronic access to documents.
UK ITU-R(03)007
* WRC-03 Agenda item 4; Review of Resolutions –ECC PT1
UK ITU-R(03)006
* WRC-03 Agenda item 4; Review of Resolutions - draft
UK ITU-R(03)005
* WRC-03 agenda item 4; Review of Resolutions of previous Conferences.
UK ITU-R(03)004
* Agenda Item 4 - Review of Resolutions - UK Draft.
UK ITU-R(03)003
* WRC-03 Agenda item 4; Review of Resolutions
UK ITU-R(03)002
* The Need for a CEPT position for WRC-03 A/I 4
UK ITU-R(02)55
* CPG Meeting UK Delegation Report : Perugia 4-8 Nov.02
UK ITU-R(02)54
* Potential ITU-R Cost Savings UK ITU-R(02)52
* Minutes of meeting of UK ITU-R: 29.10.02 UK ITU-R(02)50
* Draft ETSI standards recieved for Circ on OPs - PEs UK ITU-R(02)49
* Draft proposed Rev to CPM Rep (section 4.4 A/l 1.26) UK ITU-R(02)48
* Draft CEPT brief on A/l 1.26 UK ITU-R(02)47
* Sector Advisory Groups UK ITU-R(02)46
* Agenda Items 1.23 & 1.36 UK ITU-R(02)45
* Regulatory & Technical considerations: A/l 1.23 & 1.36 UK ITU-R(02)44
* Report from UK SG6 for ITU-R meeting 29.10.02 UK ITU-R(02)43
* Report on activities of ETSI for ITU-R meeting 29.10.02 UK ITU-R(02)42
* Agenda Item 1.5 UK ITU-R(02)41
* Completion of section 1.4 of CPM report to WRC-03 UK ITU-R(02)40
* Procedural aspects of operational & aditional op epfd limits UK ITU-R(02)39
* Preliminary Views: WRC-03 Various A/l 1.13 - 1.39 UK ITU-R(02)38
* R Jones, ITU letter Re:9/LCCE/73 UK ITU-R(02)37
* UK Input to CPM02-2: Rev to CPM 2.8.2 - A/I 1.31 UK ITU-R(02)35
* WRC-03 Agenda Item 1.34 [R Cooper] UK ITU-R(02)34
* Draft UK Contribution CEPT to the CPM: A/11.5 UK ITU-R(02)33
* UK Input to CPM02-2: WRC-03 Agenda Item 1.22 UK ITU-R(02)32
* WP6M Report & TG6/9 Report to ITU-R 29.10.02 UK ITU-R(02)31
* Report from the Chairman ITU-R WP3M to UK ITU-R UK ITU-R(02)29
* Minutes Of The Ninth Meeting Held On Friday 7 June 2002 In Wyndham House UK ITU-R(02)25
* UK brief for CPG - WRC Agenda Item 1.21 UK ITU-R(02)24
* Headline report from UK Study Group 6 from 12 February to 7 June 2002 UK ITU-R(02)23
* Summary brief for CPG on WRC Agenda Items 1.11, 1.18, 1.27, 1.29, 1.32, 1.35, 1.39 (results of CPG/PT3 meeting May 02) UK ITU-R(02)22
* Informal report to UK ITU-R on SG3 block meeting: Geneva, 20 May-4 June '02 UK ITU-R(02)21
* Proposed UK CPG input relating to an amendment to the CEPT brief for Agenda Item 1.5 UK ITU-R(02)20
* Extending the limits of applicability of the Radio Regulations above 3 000 GHz UK ITU-R(02)19
* Revised guidelines for the working methods of the Radiocommunication Assembly, Study Groups & related groups UK ITU-R(02)18
* Radio Advisory Group, 25 February-1 March 2002, Delegation report UK ITU-R(02)16
* Satellite Backlog Action Group UK ITU-R(02)15
* Informal group on the draft ITU Strategic Plan 2003-2007
UK ITU-R(02)14
*

Draft Minutes - Eighth meeting UK ITU-R 12.2.

UK ITU-R(02)13
*

Proposals Relation to Resolution 80 (Rev.WRC-2000) (Shaw)

UK ITU-R(02)12
*

Contribution to the CPG03-3 meeting (Oslo) (Jaycock)

UK ITU-R(02)11
*

Timing of ITU-R Study Group Meetings (Shaw)

UK ITU-R(02)10
*

RAG - Draft Brief - The Radio Regulatory Board (Barrett)

UK ITU-R(02)09
*

RAG - Draft ITU-R Study Group Structure (Barrett)

UK ITU-R(02)08
*

Optimum Structure for WRC-2003 (Shaw)

UK ITU-R(02)07
*

Resolution 80 Briefing notes (Shaw)

UK ITU-R(02)06
*

Comments to the RRB and RAG on Columbian doc (Shaw)

UK ITU-R(02)05
*

UK Delegation Report - 4th CPG/PTI meeting. Paris 23-25.1.02

UK ITU-R(02)04
*

Agenda for Eighth meeting UK ITU-R 12.2.02 (Secretary)

UK ITU-R(02)03
*

Canada - Terrestrial Wireless Communications Structure(Barratt)

UK ITU-R(02)02
*

Final Report RAG WRC-CPM Process Review (Barratt)

UK ITU-R(02)01
* Draft UK Input to the WRC/CCPM Process Review UK ITU-R(01)62
* RAG WRC-CPM Process Review Spain UK ITU-R(01)61
* RAG WRC-CPM Process Review France UK ITU-R(01)60
* RAG WRC-CPM Process Review Canada UK ITU-R(01)59
Bullet Point SG8 Meeting Report UK ITU-R(01)58
Bullet Point Timing of ITU-R SG Meetings in Relation to Meetings of their WPS and TGS UK ITU-R(01)57
* Minutes of UK ITU-R Meeting 23 November 2001 UK ITU-R(01)56
Bullet Point Headline Report for SG6 UK ITU-R(01)55
Bullet Point Headline Report for SG4 UK ITU-R(01)54
Bullet Point CPG/PT1-0S Delegate's Report UK ITU-R(01)53
Bullet Point 3rd CPG PT1 Meeting, 24-26 Oct 2001, Luxemborg - Possible Structure for WRC-03 UK ITU-R(01)52
Bullet Point Establishment of the Global Radiocomms Standardisation Collaboration UK ITU-R(01)51
Bullet Point Letters sent to various ITU entities concerning SAT_BAG UK ITU-R(01)50
Bullet Point Agenda for UK ITU-R Briefing Group Meeting 22 November 2001 UK ITU-R(01)49
Bullet Point Summary Report of the ITU-R SG4-9 (Fixed/Fixed Sat Service Sharing) Meeting, 24 Oct 2001, Geneva UK ITU-R(01)48
Bullet Point Summary Report of the ITU-R SG9 (Fixed Services) Meeting 11-12 Oct 2001, Geneva UK ITU-R(01)47
Bullet Point Resolution 80 WRC 2000 - RAG Correspondence Group UK ITU-R(01)46
Bullet Point Satellite Backlog Action Group, Geneva 1-2 October 2001. Delegation Report. UK ITU-R(01)45
Bullet Point CPG, Paris, 4-6 September 2001 - Delegation Report UK ITU-R(01)44
Bullet Point Minutes of meeting of ITU_R held on 30 August 2001 UK ITU-R(01)43
Bullet Point Draft Guidelines for the Working Methods of the Radiocomm Assembly, the Radiocomm SG's and Related Groups UK ITU-R(01)42
Bullet Point Draft Decision of SG6 UK ITU-R(01)41
* Draft UK Input to SAT-BAG. An update on the factors associated with the satellite filing backlog UK ITU-R(01)40
Bullet Point UK Preparation for CPG03-2: Checklist of CEPT Briefs for WRC03 (prepared 29 August 2001) UK ITU-R(01)37
Bullet Point UK Proposals for changes to the draft CEPT for Agenda Item 1.21 UK ITU-R(01)36
Bullet Point Comments on CEPT brief UK ITU-R(01)35
Bullet Point Headline Report for UK Study Group 6 UK ITU-R(01)33
* This document shows ETSI Ops (One-Step-Approval) Pes (Public Enquiry) and Votes received from ETSI since March 2001 UK ITU-R(01)32
Bullet Point Calling Notice - 3 August 2001 Notice
Bullet Point Agenda for Meeting UK ITU-R on 30 August 2001 UK ITU-R(01)31
Bullet Point Comments on the Strategic Plan Structure and Proposals for new ITU-R Goals UK ITU-R(01)30
Bullet Point Delegation Report RAG 12-16 March 2001 UK ITU-R (01)28
Bullet Point ITU Reform Group Final Meeting, Salvador, Brazil 2-6 April 2001 - Delegation Report UK ITU-R (01)27
Bullet Point Delegate's Report ITU Reform, Paris 1-2 March 2001 UK ITU-T (01)30
Bullet Point Radio Advisory Group, 12-16 March 2001 Delegation Report UK ITU-R (01)27
Bullet Point Minutes of Meeting 6 February 2001 UK ITU-R (01)22
Bullet Point UK Delegation report on the first meeting of ITU-R JTG 4-7-8-9 UK ITU-R (01)16
Bullet Point Convener, Correspondence Group on ITU-R Study Group Structure 1 UK ITU-R (01)15
Bullet Point Organisation of work in the CPG UK ITU-R (01)11
Bullet Point Convener, Correspondence Group on ITU-R Study Group Structure 1 UK ITU-R (01)10
Bullet Point Radiocommunication Advisory Group - Linking Operational & Financial Planning UK ITU-R (01)09
Bullet Point Headline Report from UK Study Group 6 UK ITU-R (01)08
Bullet Point Headline Reports from UK SG4 and UK JTG4-7-8 UK ITU-R (01)07
Bullet Point ITU-R Study Group 9 (Fixed Services) Headline Report to February 2001 UK ITU-R (01)06
Bullet Point ETSI Ops (One-Step-Approval) Pes (Public Enquiry) and Votes received from ETSI since October 2000 UK ITU-R (01)04
Bullet Point Draft 2001 Operational Plan for ITU-R Sector

UK ITU-R (01)03

Bullet Point Ninth meeting of the Radiocommunication Advisory Group UK ITU-R (01)02
Bullet Point Study Group 8 Meeting Report UK ITU-R (00)40

Top button

*

Study Group 1 - ITU Documents

Bullet Point CP(01)29 Draft Minutes Of Meeting Of UK Study Group 1 Held On Friday 28 September 2001, Wyndham House At 13.30 PM.
Bullet Point CP(01)28 CEPT Views and Identified Regulatory Issues on the Impact of UWB Systems on Other Radio Services, in Particular the Passive Services
Bullet Point CP(01)27 CEPT Views & Identified Regulatory Issues on the Impact of UWB Systems etc.
Bullet Point CP(01)26 Agenda for UK SG1 Meeting on 28/09/01
Bullet Point CP(01)05 Delegates Report ITU-R Study Group 1

Task Group 1/8 - ITU Documents

Bullet Point CP(03)11 Propagation Model for UWB on Fixed Service
Bullet Point CP(03)10 GSME position UWB final 14 February 2003
Bullet Point CP(03)09 UWB Compatibility Study (LS to WGSE PT24)
Bullet Point CP(03)08 UWB Protection for Aviation Systems
Bullet Point CP(03)07 Potential of UWB rev1
Bullet Point CP(03)06 Definition of UWB Systems
Bullet Point CP(03)05 Airborne interface estimates
Bullet Point CP(03)04 TG 1/8 Temps set 1
Bullet Point CP(03)03 UK Delegation Report ITU-R TG1/8 21-24 Jan 2003
Bullet Point CP(03)02 Draft agenda

Top button

Study Group 3 - ITU Documents

Bullet Point CP96 Comments on Observations to 1546
Bullet Point CP94 Informal report to UK ITU-R on SG3 block meeting: Geneva 20 May - 4 June '02
Bullet Point CP93 Report from Chairman ITU-R WP 3M to UK ITU-R
Bullet Point CP92 Proposed revision to Recommendation ITU-R P. 531-6. Improved procedure for evaluating TEC. (Please note this document was submitted to Geneva by the French Administration).
Bullet Point CP91 Minutes of the 9th meeting of UK Study Group 3 held on 7 May 2002
Bullet Point CP89/90 Proposed revision to the method for predicting vegetation attenuation above 1 GHz in Recommendation ITU-R P.833.2
Bullet Point CP88 Proposed Revision To The Mode (2) Rain Scatter Interference Prediction Methodology In Recommendation ITU-R P.452-10
Bullet Point CP87 A New Model For Mode (2) Rain Scatter Interference Calculations For Recommendation ITU-R P.452 (Revision 1) Zip logo (2.7 MB)
Bullet Point CP86

Proposed Revision To Recommendation ITU-R P. 1411-1: Frequency Difference Functions (Revision 1)

Bullet Point CP85 Proposed Revision To Recommendation ITU-R P. 1411-1: Dependence Of RMS Delay Spread On Shadowing (Revision 1)
Bullet Point CP82 Comments On 3M/50: Model Combination for Transhorizon paths in P.452.
Bullet Point CP81 Proposed Revision Of Recommendation ITU-R P.452 - Removal Of Discontinuities - Further Proposed Changes (Revision 1) Zip logo (776 KB)
Bullet Point CP74 Recommendation ITU-R P.533 - HF propagation prediction method. Recommendation ITU-R P.842 -Computation of reliability & compatability of HF radio systems.
Bullet Point CP73 Proposed revisions to Recommendation ITU-R P 620-4
Bullet Point CP72 Element for inclusion in Handbook on interference
Bullet Point CP71 A new model for Mode (2) rain scatter interference calculations for Recommendation ITU-R P 620-4
Bullet Point CP70 Route dependence of wideband channel characteristics (Revision 1)
Bullet Point CP69 Proposed Revision to Recommendation ITU-R P. 1407 - Multipath Propagation and Parameterisation of its Characteristics (Revision 1)
Bullet Point CP65 Multipath Propagation & Parameterisation of its Characteristics.
Bullet Point CP64 Minutes of the 7th meeting of UK Study Group 3 held on 1 November 2001
Bullet Point CP61 Minutes of the 6th meeting of UK Study Group 3 held on 26 September 2001
Bullet Point CP67 Information Paper: Development towards a model for combined rain and sleet attenuation (Revision 3)
Bullet Point CP66 Proposed revision of P.1546
Bullet Point CP65 Information document, Comments in response to document 3K/19 - Dr Bacon
Bullet Point CP62 A generic model for the determination of 1-60 GHz radio propagation loss through vegetation - Dr Rogers
Bullet Point CP60 Minutes if the 4th meeting of UK Study Group 3 held on 4 April 2002
Bullet Point CP55 UK input - Proposed deletion of Recommendations
Bullet Point CP54 UK input - Further developments on mode (2) rain scatter interference calculations for Recommendation ITU-R P.620-4, and comparisons with Recommendation ITU-R P.452-9 and experimental measurements
Bullet Point CP53 UK input - Indoor reception measurements of UHF television signals
Bullet Point CP52 UK input - Proposed revision to Recommendation ITU-R P.837-2
Bullet Point CP51 UK input - Draft update for Chapter 6 on Gaseous Attenuation, for the WP3J Handbook on Radiometeorology
Bullet Point CP49 Sample test results using [DNR] with profile interpretation
Bullet Point CP48 Proposed revision to Recommendation ITU-R P.838
Bullet Point CP46 Proposed revisions of [DNR]
Bullet Point CP45 Comparision of models for rain attenuation
Bullet Point CP44 Modelling rain scatter interference: A fresh analysis
Bullet Point CP43 Recommendation P.452. An aide memoire
Bullet Point CP42 Future working practices
Bullet Point CP38 Question ITU-R 265/4
Bullet Point CP1 rev4 List of UK SG3 committee papers - 5 april 2001

Top button

Study Group 4 - ITU Documents

Bullet Point CP(03)13 ITU-R WP4B issues for UK SG4 consideration
Bullet Point CP(03)12 Minutes 27 February 2003
Bullet Point CP(03)11 Executive summary report of ITU-R WP4B meeting, Geneva, 21-28 March 2003
Bullet Point CP(03)10 Chairmans report from the meeting of working party 4A, Geneva, 10 - 19 March 2003
Bullet Point CP(03)09 Peak to Mean Ratios of PSK Spectra
Bullet Point CP(03)08 WP4A France Contributions Zip logo
Bullet Point CP(03)07 Canadian contributions to WP4A and WP4B meetings Zip logo
Bullet Point CP(03)06 Report to WP4A Automation of article S5
Bullet Point CP(03)05 Proposed modification to Recommendation S.524-7
Bullet Point CP(03)04 off-axis EIRP spectral density limits for the band 27.5-29.5 Ghz FSS band to Recommendation S.524-7
Bullet Point CP(03)03 epfd statistics for various types of HEO system in the 4 GHz FSS band
Bullet Point CP(03)02 Draft agenda 27 February 2003
Bullet Point CP(03)01 Guidelines for removal of non-compliance with operational and additional operational epfd limits
Bullet Point CP(02)43 Minutes 18 December 2002
Bullet Point CP(02)36 Minutes of meeting: UK SG4, 9 September 2002
Bullet Point CP(02)34 Framework for further ITU-R studies concerning HEOs
Bullet Point CP(02)33 Procedural aspects of Operational and Add op. epfd limits
Bullet Point CP(02)32 Note from UK Chairman to Taylor & VonDeak Re: Correspond. group
Bullet Point CP(02)31 Agenda for meeting of UK SG4: 9.9.02
Bullet Point CP(02)30 Explanation of Changes: Two tables of parameter values for ESVs
Bullet Point CP(02)27 (Ad. 1) Response to Mr Rossi Re: Review of WRC Res's & Rec's
Bullet Point CP(02)27 General view of Resolutions & Recommendations of WARC/WRC
Bullet Point CP(02)24 (final) Minutes of UK SG4 meeting: 30.5.02
Bullet Point CP(02)23 (Rev 1) Update: Environmental protection GSO
Bullet Point CP(02)21 Report of meeting of WP4B: April 2002
Bullet Point CP(02)20 Summaries of recently adopted SG4 RECS/REVS
Bullet Point CP(02)19 Chairman's report from WP4A:April 2002
Bullet Point CP(02)18 (modified) Ito letter from Chairman UK SG4
Bullet Point CP(02)17 Minutes of tenth meeting UK SG4: 22 March 2002
Bullet Point CP(02)15 Sharing of the FSS allocation at 40/50 GHz
Bullet Point CP(02)14 WRC Agenda item 1.37
Bullet Point CP(02)13 Draft conference preparatory meeting report, section 3.4
Bullet Point CP(02)12 WRC-03 Agenda item 1.6: regulatory measures to protect MSS feeder links
Bullet Point CP(02)09 Protection of passive service bands below 30 GHz Zip logo
Bullet Point CP(02)07 Inter-Agency Space Debris Co-ordination Committee recommendation
Bullet Point CP(02)06 Chairman WP4A: Liaison statement to WP6S on simplification of RR/app.4 Zip logo
Bullet Point CP(02)05 Agenda for UK SG4 meeting: 22 March 2002
Bullet Point CP(02)04 Protection of RAS reception in the 42.5 to 43.5 GHz from unwanted emissions by FSS
Bullet Point CP(02)03

Minutes of UK SG4 meeting on 11 January 2002

Bullet Point CP(01)81

Minutes of UK SG4 meeting on 26 November 2001

Bullet Point CP(01)80 Delegate's Report - ITU WP4A Meeting - 3-12 Oct 2001, Geneva
Bullet Point CP(01)79

Report of Meeting of WP4B

Bullet Point CP(01)78 Chairmans Report fron the Mtg of WP4A 3-12 Oct 2001
Bullet Point CP(01)77 Report on Progress of WP4A since Oct 2000 Mtg of SG4
Bullet Point CP(01)76 Agenda for meeting of UK SG4 on 26 November 2001
Bullet Point CP(01)75 On the use of Simulation Techniques to verify Compliance of non-GSO FSS Sat Systems with the additional operational limits to epfd (down ) & proposed Modification of PDNR S. [4A/TEMP/100]
Bullet Point CP(01)74 Proposed Revision to Text on methodology to Derive Continuous Curves efpd
Bullet Point CP(01)73 Establishment of an electronic Databank of Sat System Characteristics for Freq Sharing Studies etc.
Bullet Point CP(01)72 Draft UK WP4A Paper - 17.3 - 17.7GHz
Bullet Point CP(01)71 TT&C Spectrum Requirement below 17GHz - Draft UK Contribution to WP4A
Bullet Point CP(01)70 Draft New UK Recommendation on Question ITU-R 256/4
Bullet Point CP(01)69(1) Minutes of UK SG4 Held on 23 August 2001
Bullet Point CP(01)68 UK Brief (T Onoro) Interference Criteria to Protect FSS from Interference prod by GSO satellites, etc.
Bullet Point CP(01)67 DOC WP9D/UK2: Preliminary Draft New Recommendation etc.
Bullet Point CP(01)66 DOC WP9D/UK1: Preliminary Draft New Recommendation etc.
Bullet Point CP(01)65(1) Minutes of UKSG9 meeting on 7 September 2001
Bullet Point CP(01)64 Proposed Revision to PDNR on Methodology to Derive Continuous Curves of EPFD
Bullet Point CP(01)63 Draft Paper addressing the 17.3 to 17.7GHz Reverse Band Working Issue
Bullet Point CP(01)62 The Role of Recommendations in the Development of Regulatory Procedures for the Application of Operation EPFD Limits
Bullet Point CP(01)61 HDFSS and FS Sharing in V Band
Bullet Point CP(01)60 Agenda - 23 August 2001
Bullet Point CP(01)59 Possible Modification of ITU-R Recommendation S.534-7 to include the Band 27.5-29.5GHz
Bullet Point CP(01)58 Addit Possibillity for UK Contribution to WP4A. Protection of Radioastronomy in the band 42.5-43.5 GHz
Bullet Point CP(01)57 Draft Revision of Preliminary CEPT Brief
Bullet Point CP(01)56 Summaries of DNR's and DRR's produced by April 2001 WP4A meeting
Bullet Point CP(01)55(02) Minutes of UK SG4 Meeting on 21 June 2001
Bullet Point CP(01)53 Agenda for UK SG4 - 21 June 2001 at 10:30am in Room 8B01/8B02
Bullet Point CP(01)52 Summary Report of the Joint Task Group 4-7-8 Meeting May/June 2001
Bullet Point CP(01)51 UK Report of Meeting if ITU-R WP 4A held in Seattle, USA from 23 April - 2 May 2001
Bullet Point Calling Notice UK SG4 - 21 June 2001
Bullet Point CP(01)50 Minutes of Fourth meeting held on Tuesday 3 April 2001 at Wyndham House
Bullet Point CP(01)49 Simplification of APS4 - Resolution 86
Bullet Point CP(01)48 WP4A. Working Document on Reverse Band Sharing in the Band 17.3-17.7GHz
Bullet Point CP(01)46 Subject IP Over Satellite
Bullet Point CP(01)45
Bullet Point Zipped version
Subject WRC-2000 Resolution 137
 
Bullet Point CP(01)42a1 Further list of USA documents
Bullet Point CP(01)42 List of USA documents
Bullet Point CP(01)10 UK WP 4-9S
Bullet Point Calling Notice UK SG4

Top button

Study Group 6 - ITU Documents

Bullet Point CP(03)10 Delivery of Interactive Electronic Cinema and Theatre Through Broadvasting Systems
Bullet Point CP(03)08 Draft Agenda for Eleventh Meeting of UK Study Group 6 held on 8 September 2003
Bullet Point CP(03)07 BT Full Reference Video Model for Incorporation into New ITU-R Standard
Bullet Point CP(02)38 Minutes of the eigth meeting of UK Study Group 6 held on Wednesday 17 October 2002 in Wyndham House
Bullet Point CP(02)33 Minutes of meeting of UK SG6: 17 July 2002
Bullet Point CP(02)28 Minutes of the sixth meeting of UK Study Group 6 held on Wednesday 17 April 2002 in Wyndham House
Bullet Point CP(02)16 Minutes of the fifth meeting of UK Study Group 6 held on Monday 25 February 2002
Bullet Point CP(01)104 Minutes of a UK Study Group 6 briefing meeting for the first meeting of Task group 6/8 held on Tuesday 27 November 2001 - Secretary
Bullet Point CP(01)103 European Broadcasting Union - Proposal to TG6/8 for a revision of ITU-R document 6/207 - Mr Laffin
Bullet Point CP(01)102 Draft agenda for the UK Study Group 6 meeting for briefing of the first Task Group 6/8 meeting, 27 November 2001
Bullet Point CP(01)101 Minutes of the fourth meeting of UK Study Group 6 held on Thursday 18 October 2001 in Wyndham House - Secretary
Bullet Point CP(01)98 Draft agenda for the 4th meeting of UK SG6 on Thursday 18 October 2001
Bullet Point CP(01)97 Brief notes on aspects of the ITU SG6P meeting held in September 2001 - Terry Long
Bullet Point CP(01)96 Minutes of the third meeting of UK Study Group 6 held on Wednesday 20 June 2001. Secretary.
Bullet Point CP(01)95 Brief notes on aspects of the ITU-R WP6P meeting held in March 2001 - Terry Long
Bullet Point CP(01)85 Draft agenda for a meeting of UK Study Group 6 to held on Wednesday 20 June 2001
Bullet Point CP(01)84 United Kingdom: Relationship between the spectrum allocation aspects of agenda items involving the broadcasting service in the HF bands at WRC-2003 and WRC-2005/6
Bullet Point CP(01)83 Notes on the UK SG6 DTTB Coordination Group meeting, 12 February 2001, Winchester
Bullet Point CP(01)82 UK - Proposal to modify RR S5. 134
Bullet Point CP(01)81 UK - Resolutions and Recommendations related to WRC-03 agenda 1.2
Bullet Point CP(01)80 UK - Resolution 517 (Rev. WRC-03). Introduction of digitally modified transmissions and single-sidebanded transmissions in the high-frequency bands between 5 900KHZ and 26 100KHZ allocated to the broadcasting service
Bullet Point CP(01)79 UK - Draft Recommendation YYY (WRC-03). RF protection ratios associated with digital emissions in the HF bands allocated exclusively to the broadcasting service
Bullet Point CP(01)78 UK - Recommendation 517(Rev.WRC-03). RF protection ratio values for single-sidebanded (SSB) emissions in the HF bands allocated exclusively to the broadcasting service
Bullet Point CP(01)77 UK - Proposed modification to appendix S11 to include new Part C on digital system specification
Bullet Point CP(01)17 Minutes of the second meeting of UK Study Group 6 held on Wednesday 17 January 2001

Top button

Study Group 7 - ITU Documents

Bullet Point CP(03)12 Report of Study Group 7, Feb 2003
Bullet Point CP(03)11 UTC & Leap Sounds: The Status Quo & Emerging Issues
Bullet Point CP(03)10 Minutes 30 January 2003
Bullet Point CP(03)09 Agenda 14 April 2003
Bullet Point CP(03)07 PT2 Drafting Group report agenda items 1.12 & 1.38
Bullet Point CP(03)06 Amended ECP 1.12
Bullet Point CP(03)05 Amended Brief 1.12
Bullet Point CP(03)04 Final output CPM for agenda item 1.38
Bullet Point CP(03)03 Final output CPM for agenda item 1.12
Bullet Point CP(03)02 Draft revision to Recommendation ITU-R SA. 1260
Bullet Point CP(03)01 Agenda 39 Jan 2003
Bullet Point CP(02)20 Minutes of 9th meeting of UK SG7: 5.9.02
Bullet Point CP(02)19 Briefing Notes for 1.38
Bullet Point CP(02)17 WRC Agenda item: 1.38
Bullet Point CP(02)15 Recommendation ITU-R RA 1031-1 (Old version)
Bullet Point CP(02)14 Recommendation ITU-R RA 1031-1 (updated version 3.9.02)
Bullet Point CP(02)11 Attendance and Documentation groups: August 2002

Bullet Point

CP(02)09

(faxback) Response form for letter CP(02)09

Bullet Point

CP(02)09

(2nd) Letter from Chairman of UK SG7 concerning attendance groups

Bullet Point

CP(02)07

Minutes of meeting of UK SG7: 29 April 2002

Bullet Point CP(02)04 Minutes of UK SG7 Meeting 21 January 2002
Bullet Point CP(02)03 Proposed liaison statement from Working Party 7C to Joint Rapporteur Group 8A-9B on WRC Agenda Item 1.5 [Cept administration]
Bullet Point CP(02)02 Sharing between Mest earth stations anf mobile earth stations in band 1670-1710 MHz
Bullet Point CP(02)01 Agenda for the 6th meeting of UK SG7 - 21.02.02
Bullet Point CP(01)30 Minutes of UK SG7 Meeting on 8 October 2001
Bullet Point CP(01)26(2) Minutes of UK SG7 Meeting on 5 July 2001
Bullet Point CP(01)23 Summary Report of the Joint Task Group 4-7-8 Meeting May/June 2001
Bullet Point Calling Notice 5 July 2001
Bullet Point CP(01)22 Minutes of the 4th Meeting of UK SG7 on 14 March 2001

Top button

Study Group 8 - ITU Document

There are currently no documents online for this study group.

Working Party Documents

8F - ITU Document

Bullet Point WP(03)85 12th Meeting - ECC Project Team 1 (ECC/PT1). Helsinki 19 - 21 January 2004.
Bullet Point WP(03)84 Informal UKWP8F workplan for guidance/planning purposes
Bullet Point WP(03)83 Timetable to respond to Mandate 5
Bullet Point WP(03)82 Report from CEPT. 5th Mandate on IMT-2000.
Bullet Point WP(03)81 UK Itu-R Study Groups 2003 -2007. UK Working Party 8f Briefing Meeting. Tuesday 16th December 2003.
Bullet Point WP(03)80 UK Summary report of ITU-R WP8F. 11th meeting of 8F, Edinburgh, 8-16th October 2003.
Bullet Point WP(03)79 Draft Minutes Of The UK Working Party 8f Meeting Held At 10:30 Am On Tuesday 23rd Spetember 2003 At Wyndham House
Bullet Point WP(03)78 Liaison Statement from WG SE on UWB and protection criteria for the Radio Astronomy band 2690 - 2700MHz
Bullet Point WP(03)77 ASMS-TF Report. Forecast of MSS Traffic and Spectrum Requirements to 2010.
Bullet Point WP(03)76 ECC PT1 Workplan.
Bullet Point WP(03)75 Use of the 2010 to 2025 MHz Band for the Provision of 3G Telecommunications Services. A Consultation Document.
Bullet Point WP(03)74 Consideration of Possible Frequency Plans for the 3G Expansion Spectrum, 2500 to 2690 MHz Zip logo
Bullet Point WP(03)73 Channelling arrangement within the additional frequency band of 2500 – 2690 MHz
Bullet Point WP(03)72 ECC Project Team 1 (ECC/PT1). Consideration of further steps for development of "Methodology of Spectrum Estimation"
Bullet Point WP(03)71 ECC Project Team 1 (ECC/PT1). Working assumptions on frequency arrangements in the 2500 -2690 MHz band
Bullet Point WP(03)70 ECC Project Team 1 (ECC/PT1). Flexible use of UMTS TDD bands.
Bullet Point WP(03)69 Mason Communications investigation - (UWB) devices.
Bullet Point WP(03)68 Finland. STREAMLINING THE WORK IN WP8FZip logo
Bullet Point WP(03)67 Future Work In WP8F Regarding Satellite Issues
Bullet Point WP(03)66 Methodologies to estimate spectrum requirements. A Draft Report for The Radiocommunications Agency. Quotient Associates.
Bullet Point WP(03)65 A possible contribution to WP 8F. A Draft Report for The Radiocommunications Agency. Quotient Associates.
Bullet Point WP(03)64 UK Summary report of ECC PT1 in St Petersburg, 17 -19th September 2003
Bullet Point WP(03)63 Draft Minutes Of The UK Working Party 8f Meeting Held At 10:30 Am On Monday 8th September 2003 At Wyndham House
Bullet Point WP(03)62 UK Itu-R Study Groups 2000 - 2003, Uk Working Party 8f Briefing Meeting, Tuesday 23rd September 2003
Bullet Point WP(03)61 TSG-RAN Working Group 4 (Radio) meeting #28
Sophia Antipolis, France, 18th - 22nd August 2003
Bullet Point WP(03)60 Comments on doc 8F(03)53 (=ECC PT1 (03)95)
Bullet Point WP(03)59 Frequency arrangement in 2.5GHz band
Bullet Point WP(03)58 Spectrum Estimation Methodology document.
Bullet Point WP(03)57 Future work in WP8F regarding satellite issues
Bullet Point WP(03)56 Draft UK Contribution to CEPT PT1 outlining proposed contributions to WP8F on IMT.MITIGATION
Bullet Point WP(03)55 Proposed liaison statement from WP8F to WP8D. Studies in preparation for WRC-07
Bullet Point WP(03)54 Utilisation Of The 2.5 Ghz Spectrum For Imt-2000 (‘3g’)
Discussion, Options And Recommendations. Sub-Group Of Uk Itu-R Working Party 8f.Zip logo
Bullet Point WP(03)53 Protection requirements for the Radio Astronomy Service in the band above 2690 MHz when MSS uplink is operated in the adjacent band 2670-2690 MHz
Bullet Point WP(03)52 Draft Revised Terms Of Reference. Ecrc Project Team 1 On Umts/Imt-2000 And Systems Beyond.
Bullet Point WP(03)51 Mandate to CEPT to harmonise the frequency usage within the additional frequency band of 2500 - 2690 MHz to be made available for IMT-2000/UMTS systems in Europe (Mandate 5)
Bullet Point WP(03)50 Results of the first World Radiocommunication Conference Preparatory Meeting
Bullet Point WP(03)49R1 Revised draft Agenda for UK Working Party 8F Briefing Meeting to be held on Monday 8th September 2003
Bullet Point WP(03)49 Draft Agenda for UK Working Party 8F Briefing Meeting to be held on Monday 8th September 2003
Bullet Point WP(03)48 Draft minutes of the UK Working Party 8F meeting held at 10:30 am on Wednesday 9 April 2003 at Wyndham House, 189 Marsh Wall, London, E14 9SX
Bullet Point WP(03)47 Draft work-plan on all matters relevant to ECC/PT1.
Bullet Point WP(03)46 Report on sharing and adjacent band compatibility in the band 2500-2690 MHz
Bullet Point WP(03)45 UK Summary report of ECC PT1 in Dublin, 14-16th April 2003
Bullet Point WP(03)44 Proposed Clarification of CEPT Brief for agenda item 1.22
Bullet Point WP(03)43 Experiences of WP8F (Brazil) Ad Hoc Migration
Bullet Point WP(03)42 Draft Agenda for UK Working Party 8F Briefing Meeting to be held on Wednesday 9th April 2003
Bullet Point WP(03)41 UK Summary report of ITU-R WP8F
10th meeting of 8F, Brazil, 26th March - 3rd April 2003
Bullet Point WP(03)40 Draft CEPT Brief on WRC-O3 Agenda Item 1.34
Bullet Point WP(03)39 Developments on WRC Agenda Item 1.34
at ITU-R JRG 6S-8F meeting on 20-21 March 2003
Bullet Point WP(03)38 Draft minutes of the UK Working Party 8F Meeting Held at 10:30 am on Friday 14 March 2003 at Wyndham House 189 Marsh Wall, London, E14 9SX
Bullet Point WP(03)37 Draft Work-plan on all matters relevant to ECC/PT1
Bullet Point WP(03)36 Draft CEPT Brief on WRC Agenda Item 1.22
Bullet Point WP(03)35 Mitigating Techniques to Address Coexistence Between IMT-2000 TDD and DD Radio Interface Technologies Within the Frequency Range 2 500-2 690 Mhz Operatiing in Adjacent Bands and in the same Gegographical Area
Bullet Point WP(03)34 Proposal for Liaison Statement TO ITU-D Study Group 2, Q.18/2 Guidelines for Network Migration to IMT-2000
Bullet Point

WP(03)33

Comparison of Results From ERC Report 65 (Adjacent Band Compatibility Between UMTS and Other Services in the 2 GHZ Band) and Document PT1 (03)05 and Document PT1 (02)024 which Both Examined the Sharing and Adjacent Channel Compatibility of Terrestrial and Satellite Components of IMT-2000 in the 2500 - 2690 MHZ Band.
Bullet Point WP(03)32 Proposed Modifications to the ITU-R WP8F Long Term Work Plan in Relation to the Modified Schedule for WRC
Bullet Point WP(03)31 One Example of a Methodology to Calculate Spectrum Requirements
Bullet Point WP(03)030 Proposal For the Structure and Scope of the Preliminary Draft New Report on services and Market Aspects of the Future Development of IMT-2000 and Systems Beyond IMT-2000
Bullet Point WP(03)029 Proposal For a Work Item on Naming of "Future Development of IMT-2000" and "Systems Beyond IMT-2000"
Bullet Point WP(03)028 ITU-R Study Group 8 Meeting Report
Bullet Point WP(03)027rev1 Draft Agenda -UK WP8F meeting 14 March 2003, Wyndham House, London E14 9SX.
Bullet Point WP(03)027 Draft Agenda -UK WP8F meeting 14 March 2003, Wyndham House, London E14 9SX.
Bullet Point WP(03)026rev1 United Kingdom - Analysis of the impact of Ultra Wide Band (UWB) to IMT-2000 Rev 1Zip logo
Bullet Point WP(03)026 United Kingdom - Analysis of the impact of Ultra Wide Band (UWB) to IMT-2000 Zip logo
Bullet Point WP(03)025 TSG-RAN Working Group 4 - LS on coexistence Between IMT-2000 TDD and FDD Radio Interface Technologies Within the Frequency Range 2 500-2 690 MHZ Operating in Adjacent Bands and in the Same Geographical Area Zip logo
Bullet Point WP(03)024 CPG: Draft CEPT Brief on WRC-O3 Agenda Item 1.34 Zip logo
Bullet Point WP(03)023 CPG - Subject: draft CEPT Brief on WRC-03 Agenda Item 1.33
Bullet Point WP(03)022 Secretary ECC PT1 - Draft Workplan on all Matters relevant to ECC/PT1
Bullet Point WP(03)021 CPG - Subject: draft CEPT Brief on WRC Agenda Item 1.22
Bullet Point WP(03)020 United Kingdom - Methodology for calculation of spectrum requirements for the future development of IMT-2000 and systems beyond IMT-2000
Bullet Point WP(03)019Rev.1 France - UTRA systems parameters update Zip logo
Bullet Point WP(03)019 France - UTRA systems parameters update Zip logo
Bullet Point WP(03)018 Working document towards a Draft ECC Report on sharing and compatibility between terrestrial IMT-2000 and other services in the 2500 - 2690 MHz band.
Bullet Point WP(03)017 UK Summary report of ECC PT1 in Groningen, 20-22 January 2003.
Bullet Point WP(03)016 Draft minutes of the UK Working Party 8F meeting held at 10:30am on Thursday 9 January 2003 at Wyndham House, 189 Marsh Wall, London, E14 9SX
Bullet Point WP(03)015 Virtual Centre of Excellence in Mobile and Personal Communications - Mobile VCE - Core Research Programmes
Bullet Point WP(03)014 ERO - Results of Public consultation on ECC REC(01)01
Bullet Point WP(03)013 Secretary ECC PT1 - Draft Workplan on all Matters relevant to ECC/PT1
Bullet Point WP(03)012 UK - CEPT Brief and ECP on Agenda item 1.22
Bullet Point WP(03)011 Comments on the Radiocommunications Agency report 'Impact of UWB on Third Generation Telecommunications (3G), Final Report, December 2002'.
Bullet Point WP(03)010 Draft contribution to ECC PT1 on the WRC Agenda Item 1.34 ECP and Brief
Bullet Point WP(03)009 ECC PT1- WRC-03 Agenda Item 4; review of Resolutions
Bullet Point WP(03)008 UK - WRC-03 Agenda Item 4; review of Resolutions
Bullet Point WP(03)007 CPG PT1 - WRC-03 Agenda Item 4; Review of Resolutions of previous Conferences
Bullet Point WP(03)006 UK Draft Brief Agenda Item 4 - Review of Resolutions
Bullet Point WP(03)005 Vodafone Group - WRC-03 Agenda Item 4; review of Resolutions
Bullet Point WP(03)004 CPM text for Agenda item 1.34
Bullet Point WP(03)003 CPM text for Agenda item 1.33
Bullet Point WP(03)002 CPM text for Agenda item 1.22
Bullet Point WP(03)001REV.1 UK - Compatibility Between the Terrestrial and GSO Satellite Component of IMT-2000 in the 2500 - 2690 MHz band REV.1
Bullet Point WP(03)001 UK - Compatibility Between the Terrestrial and GSO Satellite Component of IMT-2000 in the 2500 - 2690 MHz band
Bullet Point WP(02)121 Draft agenda - UK WP8F Briefing meeting 10.30am, Thursday 9 January 2003, Radiocommunications Agency, Room 14Y/13B, Wyndham House,189 Marsh Wall, London E14 9SX. Zip logo
Bullet Point WP(02)120 ECC PT1 - Draft Brief - Agenda Item 1.22 : To consider progress of ITU-R studies concerning future development of IMT-2000 and systems beyond IMT-2000, in accordance with Resolution 228 (WRC-2000)
Bullet Point WP(02)119 ECC PT1 - Agenda Item 1.33 : HAPS within IMT-2000 bands.
Bullet Point WP(02)118 ECC PT1 - Draft CEPT ECP on WRC-03 Agenda Item 1.22.
Bullet Point WP(02)117 ECC PT1 - WRC-03 Agenda Item 7.2; Future Conference Agenda Items.
Bullet Point WP(02)116 ECC PT1 - WRC-03 Agenda Item 7.2; Future Conference Agenda Items.
Bullet Point WP(02)115 ECC PT1 - Draft CEPT Brief on WRC-03 Agenda Item 1.34
Bullet Point WP(02)114 ECC PT1 - Draft CEPT Brief on WRC-03 Agenda Item 1.33
Bullet Point WP(02)113 ECC PT1 - Agenda Item 1.34 : to review the results of studies in response to Resolution 539 (WRC-2000) concerning threshold values for non-GSO BSS (sound) in the band 2630-2655 MHz, and to take actions as required.
Bullet Point WP(02)112 Draft minutes of the UK Working Party 8F meeting held at 10:30 am on Tuesday 17 September at 1 Victoria Street, London, SW1
Bullet Point WP(02)111 UK Summary report of ITU-R WP8F 9th meeting of 8F, Geneva, 25th September - 3rd October 2003.
Bullet Point WP(02)110 Draft Agenda - UK WP8F Meeting 17 September 2002.
Bullet Point WP(02)109 United Kingdom - Parameters and criterion to be used in co-frequency sharing and PFD threshold studies between IMT-2000 systems and BSS (sound) services In the 2 630-2 655 MHz band.
Bullet Point WP(02)108 [FRANCE]? Characteristics of terrestrial IMT-2000 systems for frequency sharing/interference analyses
Bullet Point WP(02)107 [France, Spain, United Kingdom] Regulatory status of Terrestrial Repeaters within the satellite component of IMT-2000
Bullet Point WP(02)106 Germany - Agenda Item 7.2 - Delete agenda Item 2.15 (WRC-06) or merge it with 2.16 (WRC-06) and modify the briefs on 1.21 (WRC-03) and 1.22 (WRC-03) accordingly.
Bullet Point WP(02)105 United Kingdom - Text for web page on focus areas for research and further study
Bullet Point WP(02)104 Working Party 8F (WG-SPEC) [DRAFT] Liaison statement to Working Parties 3J, 3K and 3M on propagation issues for systems beyond IMT-2000
Bullet Point WP(02)103 Germany - Satellite Component of IMT-2000
Bullet Point WP(02)102 Deutsche Telekom, Nokia, Siemens -
Spectrum Requirement Estimation Methodology
Bullet Point WP(02)101 UK Summary report of ECC PT1 in Berlin, 11-13th September 2002
Bullet Point WP(02)100 Draft minutes of the UK Working Party 8F meeting held at 10:30 am on Monday 2 September 2002 at Wyndham House, Marsh Wall, London, E14 9SX
Bullet Point WP(02)099Rev.1 [Nokia, Others], [UK?]
Contribution to "Working document towards a Preliminary Draft New Report on mitigating techniques to address coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area" Rev.1
Bullet Point WP(02)099 [Nokia, others] Contribution to working document towards a preliminary draft new report on mitigating techniques to address coexistence between IMT-2000 TDD and FDD radio interface technologies within the frequency range 2 500-2 690 MHz operating in adjacent bands and in the same geographical area
Bullet Point WP(02)098 United Kingdom - ITU-R Circular Letter on focus areas for further study
Bullet Point WP(02)097 United Kingdom - ECP for Agenda Item 1.34
Bullet Point WP(02)096 SAP REG (internal ref. (02)32) - Final report from CEPT to EC on additional frequency bands as identified by WRC-2000 for IMT-2000
Bullet Point WP(02)095 ERO - Result of public consultation ECC DEC (02) FF
Bullet Point WP(02)094 Draft agenda - UK WP8F meeting 2 September 2002, at Radiocommunications Agency, Wyndham House, 189 Marsh Wall, London E14 9SX
Bullet Point WP(02)093 United Kingdom - Study to assess threshold values for BSS (sound) satellites in the 2 630-2 655 MHz band - WRC-03 Agenda Item 1.34
Bullet Point WP(02)092 United Kingdom - Methodology to assess interference between IMT-2000 and BSS (sound) systems in the 2 630-2 655 MHz band
Bullet Point WP(02)091 ICO - Mobile satellite spectrum requirements
Bullet Point WP(02)090 Possible UK contribution to WP8F on Handbook
Bullet Point WP(02)089 Vodafone - Agenda Item 7.2; Future conference Agenda Items
Bullet Point WP(02)088 Comments on 8F/Temp/276rev.1
Bullet Point WP(02)087 Secretary ECC PT1 - Draft workplan on all matters relevant to ECC/PT1.
Bullet Point WP(02)086 France - Draft ECC Recommendation on protection of IMT-2000 from BSS in the band 2520-2670 MHz
Bullet Point WP(02)085 United Kingdom - The Revision of ITU-R M. 1036
Bullet Point WP(02)084rev.1 United Kingdom - ECP for Agenda Item 1.22 rev.1
Bullet Point WP(02)084 United Kingdom - ECP for Agenda Item 1.22
Bullet Point WP(02)083 United Kingdom - Harmonized utilization of spectrum for 1.28MCPS UTRA TDD option in connection with ERC/DEC/(99)25
Bullet Point WP(02)082 United Kingdom - CPM text for Agenda Item 1.22
Bullet Point WP(02)081 List of documents which are available under the WP-8D reflector
Bullet Point WP(02)080 France - Scenarios to be considered for sharing studies between the terrestrial and the satellite component of IMT-2000 in the 2.5GHz band Zip logo
Bullet Point WP(02)079 Draft - ECC decision of xx xxxxx 2002 on the designation of frequency band 2500 - 2690 MHz for UMTS/IMT-2000 (ECC/DEC/(02)FF)
Bullet Point WP(02)078 Draft minutes of the UK WP8F meeting held on 25 May 2002 at the Britannia International Hotel, Marsh Wall, London E14
Bullet Point WP(02)077rev1 UK Summary report of the 8th meeting of ITU-R WP8F Ottawa, 29th May - 5th June 2002 rev.1
Bullet Point WP(02)077 UK Summary report of the 8th meeting of ITU-R WP8F Ottawa, 29th May - 5th June 2002
Bullet Point WP(02)076 Illustration of capabilities of IMT-2000 and systems beyond
Bullet Point WP(02)075 UK comments on PDNR
Bullet Point WP(02)074 Vodafone - [United Kingdom] Proposed improvements to ITU-R PDNR M.[IMT-VIS]CG5
Bullet Point WP(02)073 UK / France / Sweden / Germany - Working Party 8F -Work Plan
Bullet Point WP(02)072 Ireland - Proposal to initiate a study and review of the utilisation of bands already designated for either terrestrial or satellite component of UMTS/IMT-2000.
Bullet Point WP(02)071 Germany - Consideration of market assessment aspects related to the IMT-2000 satellite component
Bullet Point WP(02)070 rev.1 Draft agenda for the UK Working Party 8F meeting on 21 May 2002 at the Britannia International Hotel, Marsh Wall, London E14 rev.1
Bullet Point WP(02)070 Draft agenda for the UK Working Party 8F meeting on 21 May 2002 at the Britannia International Hotel, Marsh Wall, London E14
Bullet Point WP(02)069 Report from CEPT 1st Deliverable Mandate 4 - 22 March 2002 Zip logo
Bullet Point WP(02)068 Draft minutes of the UK Working Party 8F meeting held at 10:30 am on Friday 19 April 2002 at Radiocommunications Agency, Wyndham House, 189 Marsh Wall, London E14 9SX
Bullet Point WP(02)067 Electronic Communications Committee - Draft ECC decision of xx xxxxx 2002 on the designation of frequency band 2500 - 2690 MHz for UMTS/IMT-2000 (ECC/Dec/(02)xx)
Bullet Point WP(02)066 UK- Quality of Service (QoS) Class of Service definitions for Recommendation M.1079-1.
Bullet Point WP(02)065 Draft Liaison Statement from ECC PT1 to WGSE and SE34 regarding sharing between UMTS radars in the band 2700 - 2900 MHz
Bullet Point WP(02)064 Draft ECC Recommendation (02) xx Harmonized utilization of spectrum for 1.28MCPS UTRA TDD option in connection with ERC/DEC/(99)25
Bullet Point WP(02)063 UK summary report of ECC PT1 in Lisbon, 29 - 30th April 2002
Bullet Point WP(02)062  WRC-03 Agenda Item 1.22
Bullet Point WP(02)061  UK - Comments on IMT.VIS (CG4)
Bullet Point WP(02)060  Draft Agenda for the UK WP8F meeting 19 April 2002 at the Radiocommunications Agency, Wyndham House, 189 Marsh Wall, London E14 9SX
Bullet Point WP(02)059  ECC PT1 (IMT 2000) Questionnaire to ECC members regarding their views on the structure of ECC
Bullet Point WP(02)058  Vodafone - Proposed amendments to Annex A of the Vision PDNR, focus areas for research and further study
Bullet Point WP(02)057  Nokia - Proposed amendments to Annex A of the Vision PDNR, focus areas for research and further study
Bullet Point WP(02)056  Vodafone - Proposed text for Vision PDNR section 4.5; Spectrum Implications
Bullet Point WP(02)055  United Kingdom - The revision of ITU-R M.1036
Bullet Point  WP(02)054  UK - Draft Liaison Statement from ECC PT1 to WGSE and SE34 regarding sharing between UMTS and radars in the band 2700 – 2900 MHz
Bullet Point  WP(02)053  UK - ECC decision on the frequency band 2500-2690 MHz for UMTS/IMT-2000
Bullet Point  WP(02)052  Chair WGC sharing and compatibility Agenda Item 1.34
Bullet Point  WP(02)051  Denmark - Proposal for a reVision of ERC REC. (01) 01: Border coordination of UMTS/IMT-2000 systems
Bullet Point  WP(02)050  Sweden - ECC decision on the frequency band 2500-2690 MHz for UMTS/IMT-2000
Bullet Point  WP(02)049  WGSE - Sharing between UMTS and radars in the band 2700 – 2900 MHz
Bullet Point  WP(02)048  Draft work-plan on all matters relevant to ERC/PT1.
Bullet Point  WP(02)047  Draft minutes of the UK Working Party WP8F meeting held at 10:30 am on Monday 18 February 2002 at Radiocommunications Agency, 189 Marsh Wall, London E14 9SX
Bullet Point  WP(02)046  UK summary report of ITU-R WP8F 7th meeting of WP8F, Queenstown, 27th February – 5th March 2002
Bullet Point  WP(02)045  Focus areas for research and further study for broadband wireless applications
Bullet Point  WP(02)044  Electronic Communications Committee Draft ECC decision Of xx xxxxx 2002 on the frequency band 2500 – 2690 MHz for UMTS/IMT-2000 (ECC/dec/(02)xx)
Bullet Point  WP(02)043  Vodafone - IMT Van diagram
Bullet Point  WP(02)042  Mobile satellite system parameters for compatibility studies between the terrestrial and the satellite component of IMT-2000 in the 2500 - 2690 MHz band
Bullet Point  WP(02)041rev.1  Interference criteria for mobile-satellite systems for compatibility studies between the terrestrial and the satellite component of IMT-2000 in the 2500 - 2690 MHz band rev.1
Bullet Point  WP(02)041  Interference criteria for mobile-satellite systems for compatibility studies between the terrestrial and the satellite component of IMT-2000 in the 2500 - 2690 MHz band
Bullet Point  WP(02)040  Workplan for completing the revision of ITU-R M.1036
Bullet Point  WP(02)039  IMT Van diagram
Bullet Point  WP(02)038  Vodafone - Proposal based on UK contributions to WP8F 8F/518-e and
8F/521-e [UK] proposals for the completion of section 7.2 of CPM Report to WRC-03
Bullet Point  WP(02)037  Vodafone - IMT.VIS: Proposal for rationalisation of Section 6
Bullet Point  WP(02)036  Draft interim report from CEPT “Frequency usage to facilitate a co-ordinated implementation in the community of third generation mobile and wireless communication systems operating in additional frequency bands as identified by the WRC-2000 for IMT-2000 systems”
Bullet Point  WP(02)035  [Draft] Liaison Statement to ITU-R JTG 1-6-8-9 concerning TWIMS
Bullet Point  WP(02)034rev.1  Draft Agenda – UK WP8F meeting 18 February 2002 Room 14Y/13B Wyndham House rev.1
Bullet Point  WP(02)034  Draft Agenda – UK WP8F meeting 18 February 2002 Room 14Y/13B Wyndham House
Bullet Point  WP(02)033  Electronic Communications Committee Draft ECC Decision of xx xxxxx 2002 on the frequency band 2500 – 2690 MHz for UMTS/IMT-2000 (ECC/DEC/(02)xx)
Bullet Point  WP(02)032  Motorola – Notes on Draft Liaison Statement to ITU-R WP8A
Bullet Point  WP(02)031rev.2  Comments on Draft Report - Coexistence between IMT-2000 TDD and FDD radio interface technologies operating in adjacent bands and in the same geographical area rev.2
Bullet Point  WP(02)031rev.1  Comments on Draft Report - Coexistence between IMT-2000 TDD and FDD radio interface technologies operating in adjacent bands and in the same geographical area rev.1
Bullet Point  WP(02)031  Comments on Draft Report - Coexistence between IMT-2000 TDD and FDD radio interface technologies operating in adjacent bands and in the same geographical area
Bullet Point  WP(02)030  Orange PCS Ltd - Comments to ITU-R document 8F/183(rev.1)-e
Bullet Point  WP(02)029  UK Summary Report of ECC PT1, Brussels, 22 –23 January 2002 rev.1
Bullet Point  WP(02)028  Draft minutes of the UK Working Party 8F meeting held at 10:30 am on Friday 11 January 2002 at INMARSAT, 99 City Road, London, EC1Y 1AX
Bullet Point  WP(02)027  Draft report from CEPT “Frequency usage to facilitate a co-ordinated implementation in the community of third generation mobile and wireless communication systems operating in additional frequency bands as identified by the WRC-2000 for IMT-2000 systems Zip logo
Bullet Point  WP(02)026  Composite of UK Vision PDNR proposals
Bullet Point  WP(02)025  Interference criteria for mobile-satellite systems
Bullet Point  WP(02)024  WG Spectrum, DG 7 Chair proposed texts for section 7.2 of CPM report to WRC-03
Bullet Point  WP(02)023  Proposed CPM text element on relationship with Agenda Item 1.21
Bullet Point  WP(02)022  Mobile satellite system parameters for compatibility studies between the terrestrial and the satellite component of IMT-2000 in the 2500 - 2690 MHz band
Bullet Point  WP(02)021  Proposed text for “Recommendations” section of the Vision PDNR
Bullet Point WP(02)020 Preliminary CEPT brief on WRC-2003 Agenda Item 1.22
Bullet Point WP(02)019 Comments on the ITU WPWP Draft report on the coexistence between IMT-2000 TDD and FDD radio interface technologies operating in adjacent bands and in the same geographical area
Bullet Point WP(02)018 [CEPT] - Principles for completion of the CPM text for WRC-03 Agenda Item 1.22
Bullet Point WP(02)017 Proposed text for preface & considerings sections of Vision PDNR
Bullet Point WP(02)016 CPM text for Agenda Item 1.33 - Comments on WP/Temp/202 (rev.1) for UK brief or UK contribution
Bullet Point WP(02)015 UK comments on Draft report - Coexistence between IMT-2000 TDD and FDD radio interface technologies operating in adjacent bands and in the same geographical area
Bullet Point WP(02)014 Future use of the 2.5-2.6 GHz satellite IMT-2000 bands
Bullet Point WP(02)13 rev1 [UK or CEPT] [Draft] Liaison Statement to WP 8A - Reply to request for information for public protection and disaster relief communications (ppdr) rev 1
Bullet Point WP(02)013 [UK or CEPT] [Draft] Liaison Statement to WP 8A - Reply to request for information for public protection and disaster relief communications (ppdr)
Bullet Point WP(02)012 [UK or CEPT] The relationship between Moore's law and traffic growth
Bullet Point WP(02)011 UK - WRC-03 Agenda 1.34
Bullet Point WP(02)010 Draft agenda for the UK WP8F meeting on Friday 11 January 2002 at INMARSAT, 99 City Road, London, EC1Y 1AX.
Bullet Point WP(02)009 rev1 Further work by correspondence on the Q/A document from DG1 rev.1
Bullet Point WP(02)009 Further work by correspondence on the Q/A document from DG1
Bullet Point WP(02)008 rev1 WG Spectrum, DG 7 Chair - Proposed texts for section 7.2 of CPM report to WRC-03 rev.1
Bullet Point WP(02)008 WG Spectrum, DG 7 Chair - Proposed texts for section 7.2 of CPM report to WRC-03
Bullet Point WP(02)007 rev1 UK - ECC Recommendation (00)01 on border coordination of UMTS/IMT-2000 systems rev.1
Bullet Point WP(02)007 UK - ECC Recommendation (00)01 on border coordination of UMTS/IMT-2000 systems
Bullet Point WP(02)006 rev1 UK - 1.28 MCPS UTRA TDD rev.1
Bullet Point WP(02)006 UK - 1.28 MCPS UTRA TDD
Bullet Point WP(02)005 Preliminary Draft revision of Recommendation ITU-R M.1036-1
Bullet Point WP(02)004 France - Proposed modifications of the working document on preferred options for frequency arrangements
Bullet Point WP(02)003 France - Proposed modification to the PDNR M.1036
Bullet Point WP(02)002 France - Proposed contribution to WP8F on PFD thresholds for HAPS
Bullet Point
WP(02)001 France - CEPT position on pairing of the band 2.6 GHz with other bands

Top button

Study Group 9 - ITU Documents

Bullet Point CP(03)31 9 LCCE 78A1
Bullet Point CP(03)30 Brief to UK SG9 on UWB issues
Bullet Point CP(03)29 SE19 TM4 LS Interface Regulations
Bullet Point CP(03)28 SE19 TM4 LS Power Limitations
Bullet Point CP(03)27 SE19 TM4 LS+50 GHz
Bullet Point CP(03)26 CA 128 1st CPM Report
Bullet Point CP(03)25 WRC2007 Preparations
Bullet Point CP(03)24 WRC-03 UK Full Report Zip logo
Bullet Point CP(03)23 SG9 Questions (RA03)
Bullet Point CP(03)22 CA 129 New Study Period 03-07
Bullet Point CP(03)21 Draft Agenda 29 August 2003
Bullet Point CP(03)20 Minutes 9 May 2003
Bullet Point CP(03)19 WP9A, 9B, 9D and 4-9S delegation report
Bullet Point CP(03)18 9 - 154r1 (ESV)
Bullet Point CP(03)17 9 - 151r1 (ESV)
Bullet Point CP(03)16 9 - 150r1 (ESV)
Bullet Point CP(03)15 9 - 118r1 (2.5 Ghz BSS Vs RS Rec
Bullet Point CP(03)14 WP9D - 213A1 (2.5 GHz BBS Vs Fs)
Bullet Point CP(03)13 SG9 Delegate Report April 2003
Bullet Point CP(03)12 WP4-9S Temps April 03
Bullet Point CP(03)11 9D Temps April 03
Bullet Point CP(03)10 9B Temps April 03
Bullet Point CP(03)09 9A Temps April 03
Bullet Point CP(03)08 Agenda 9 May 2003
Bullet Point CP(03)07 Minutes 5 March 2003
Bullet Point CP(03)06 Substantiation of PDNRs ITU-R F.9D/RA43 GHz & F.9D/Meth-HDFS above 30 GHz Zip logo
Bullet Point CP(03)05 Draft revision of Recommendation ITU-R F.384-7
Bullet Point CP(03)04 WGPT SE24 Work Item relating to FS
Bullet Point CP(03)03 Draft New Question Characteristics of fixed wireless systems operating in frequency bands above about 60 GHz and associated sharing issues
Bullet Point CP(03)02 WGPT SE24 Work Item relating to FS
Bullet Point CP(03)01 Agenda 5 March 2003
Bullet Point CP(02)23 Minutes of UK SG9 Meeting: 14th March 2002 Zip logo
Bullet Point CP(02)20 A1 1.11 relaxation of AES pfd mask
Bullet Point CP(02)17 Report from DG1 on liaison with PT1 on agenda item 1.11
Bullet Point CP(02)16 CPG PT3 (6-8 March 2002) Delegates Report
Bullet Point CP(02)15 Proposed relaxation of WP-9D Ku-band AES PFD mask
Bullet Point CP(02)14 Immarsat/UK proposed input to ITU-R re: CPM-2 text of WRC-03
Bullet Point CP(02)13 Immarsat/UK proposed input to ITU-R Rev. to PDNR ITU-R SF [4-9S/ESV-A]
Bullet Point CP(02)12 Preliminary views on WRC-03 Agenda items: 1.13/18/19/24/25/26/29/32/37/39
Bullet Point CP(02)11 ITU UK Draft new recommendations [9B/HAPS1]
Bullet Point CP(02)10 18th Meeting of CEPT PT SE19 Mainz - Delegates Report
Bullet Point CP(02)09 Agenda item 1.11: Pfd mask to protect the FS - 14 - 14.5 GHz
Bullet Point CP(02)08 Sharing between Fixed Service and Fixed Satellite Service for HDFSS
Bullet Point CP(02)07 Progress Report on the studies concerning FSS in 47.2 - 50.2 GHz
Bullet Point CP(02)06 CPM Text for agenda item 1.25
Bullet Point CP(02)05 Guidelines on implementation of FSS earth stations
Bullet Point CP(02)04 CPM Text for agenda item 1.18
Bullet Point CP(02)03 Draft ECC Report 3 - Fixed service in Europe
Bullet Point CP(02)02 Delegates Report of the 15th FM34 meeting: 15-16 January 2002
Bullet Point CP(02)01 Agenda for eighth meeting of UK SG9: 14 March 2002
Bullet Point CP(01)82 Doc 8A-9B/TEMP/43 - Joint Rapporteur Grp 8A-9B.. 22-26 Oct 2001 Mtg.
Bullet Point CP(01)81 Doc.8A-9B/TEMP/57. Summary of Task Freq (Freq bands for FWA)
Bullet Point CP(01)80 Report of WP 9C meeting, Geneva 8-10 October 2001
Bullet Point CP(01)79 WP 4-9S Geneva, 15-23 October 2001. Delegates Report on SWP 4-9S 2, 3 & 5.
Bullet Point CP(01)78 Delegate Report on CEPT PT SE19 Meeting Berlin, 12-14 Sept 2001
Bullet Point CP(01)77 Delegate Report on TIU-R WP 4-9S Meeting 15-23 Oct 2001
Bullet Point CP(01)76 Delegate Report on TIU-R WP9D Meeting 2-10 Oct 2001
Bullet Point CP(01)75 ITU-R WP9A 1-8 October 2001, Geneva. Delegate's Report.
Bullet Point CP(01)74 CEPT FM34 Drafting Group for FS Trends, Mainz, 21 September 2001
Bullet Point CP(01)73 Delegate's Report of 14th FM34 Meeting 19-20 September 2001, Mainz
Bullet Point CP(01)72 Agenda for UK SG9 on 13 November 2001
Bullet Point CP(01)71 ITU-R Working Party 9B, 1-9 October 2001, Geneva. Delegate's Report.
Bullet Point CP(01)70 Summary Report of the ITU-R SG4-9 (Fixed/Fixed Sat Service Sharing) Meeting, 24 Oct 2001, Geneva
Bullet Point CP(01)69 Summary Report of the ITU-R SG9 (Fixed Services) Meeting 11-12 Oct 2001, Geneva
Bullet Point CP(01)68 UK Brief (T Onoro) Interference Criteria to Protect FSS from Interference prod by GSO satellites, etc.
Bullet Point CP(01)71 ITU-R Working Party 9B, 1-9 October 2001, Geneva. Delegate's Report.
Bullet Point CP(01)68 UK Brief (T Onoro) Interference Criteria to Protect FSS from Interference prod by GSO satellites, etc.
Bullet Point CP(01)67 DOC WP9D/UK2: Preliminary Draft New Recommendation etc.
Bullet Point CP(01)66 DOC WP9D/UK1: Preliminary Draft New Recommendation etc.
Bullet Point CP(01)65(1) Minutes of UKSG9 meeting on 7 September 2001
Bullet Point CP(01)65 UK Contibution to Geneva: Trends in the Occupancy of HF Bands primarily allocated to the Fixed & Mobile Services.
Bullet Point NOTICE Calling Notice for UK SG9 fro meeting on Tuesday 13 November 2001
Bullet Point CP(01)64 Comments from Inmarsat on UK SG9 CP(01)61
Bullet Point CP(01)63 16th Meeting of CEPT PTSE19 Helsinki, 9 - 11 May 2001. Delegate's Report
Bullet Point CP(01)62 Proposals for Modifications to Preliminary Draft CPM Text (Chapter 4.3) on WRC-03 Agenda Item 1.25
Bullet Point CP(01)61 Revision to Preliminary draft new Recommendation ITU-R SF [ESV-A]. Resolution ITU-R 82
Bullet Point CP(01)60 Analysis of Interference from Stations Operating in the AMSS into Stations Operating in the FS in the Band 14.25-14.5GHz
Bullet Point CP(01)59 PROTECTION CRITERIA FOR FSS OPERATING IN THE 14-25-14.5GHz BAND
Bullet Point CP(01)58 Methodology for Determining the Aggregate Interference Power from P-P high Density Applications in the FS
Bullet Point CP(01)57 UK SE19 Berlin 12-14 September 2001
Bullet Point CP(01)56 Trends in the Occupancy of HF Bands primarily allocated to the F &Mob Services
Bullet Point CP(01)55 delegate's Report of 13th FM34 Meeting - 12-13 June 2001, Helsinki
Bullet Point CP(01)54 Minutes of the 13th Meeting of FM PT 34
Bullet Point CP(01)53 Agenda for Meeting on 7 September
Bullet Point Calling Notice 7 September 2001
Bullet Point CP(01)51 UK SG9 Minutes of Meeting - 17 April 2001 (Wyndham House)
Bullet Point CP(01)50 Zip logo SE19 Interim, Mainz 19-20 April
Bullet Point CP(01)47 ITU-R Working Party 9D. Delegate Report 13-21 March 2001, Geneva (Sharing between the FS and all other services except the FSS)
Bullet Point CP(01)46 ITU-R Working Party 9B. Delegate's Report 12-20 March 2001, Geneva
Bullet Point CP(01)45 ITU-R Working Party 9A. Delegate Report 12-19 March 2001, Geneva (Performance & availability, interference objectives & analysis, effects of propagation & terminology)
Bullet Point CP(01)37 Minutes of meeting 23 February 2001

 

Working Party 4 -9S - ITU Documents

Bullet Point CP(03)10 Chairman's report from the meeting of Working Party 4A, Geneva, 10-19 March 2003
Bullet Point CP(01)22 WP 4-9S Geneva, 15-23 October 2001. Delegates Report on SWP 4-9S 2, 3 & 5.
Bullet Point CP(01)21 Delegate Report on CEPT PT SE19 Meeting Berlin, 12-14 Sept 2001
Bullet Point CP(01)20 Delegate Report on TIU-R WP 4-9S Meeting 15-23 Oct 2001
Bullet Point CP(01)19 Delegate Report on TIU-R WP9D Meeting 2-10 Oct 2001
Bullet Point CP(01)18 ITU-R WP9A 1-8 October 2001, Geneva. Delegate's Report.
Bullet Point CP(01)17 CEPT FM34 Drafting Group for FS Trends, Mainz, 21 September 2001
Bullet Point CP(01)16 Delegate's Report of 14th FM34 Meeting 19-20 September, 2001
Bullet Point CP(01)15 TU-R Working Party 9B, 1-9 October 2001, Geneva. Delegate's Report.
Bullet Point CP(01)14 Summary Report of the ITU-R SG4-9 (Fixed/Fixed Sat Service Sharing) Meeting, 24 Oct 2001, Geneva
Bullet Point CP(01)13 Summary Report of the ITU-R SG9 (Fixed Services) Meeting 11-12 Oct 2001, Geneva
Bullet Point 4-9S/UK2 Proposed Changes to Wporking Doc on issues related to possible identification of freq bands for high density fss
Bullet Point 4-9S/UK1 Proposals for Modifications to preliminary Draft CPM Text (Chap 4.3) on WRC-03 agenda Item 1.25

 


Top button *

International Policy Home

RA Home Page